GREEN LOO CF 4 Руководство - Страница 4

Просмотреть онлайн или скачать pdf Руководство для Туалеты GREEN LOO CF 4. GREEN LOO CF 4 11 страниц. Dry composting toilet

GREEN LOO CF 4 Руководство
4
point hole and consider the position and ensure there is enough room to fix the vent piping and fan and
there is adequate access to service the container via the hatch.
Check you have clearance in the joists for the waste chute to pass through the floor. Do not cut out the
waste chute hole in the floor until you are sure you have everything lined up in case you need to adjust the
position.
Prepare a flat, level ground for the CF 4 and dig out the excess liquids trench
The CF 4 can be installed at ground level or partially buried (up to the centre line). Dig out the excess liquids
trench as per below, allowing for the elbow and drain hose below the CF 4
Prepare the excess liquids trench, ready to receive the purple excess liquids drainage hose.