GREEN LOO KIWI-POD 소유자 설치 및 운영 매뉴얼 - 페이지 4

{카테고리_이름} GREEN LOO KIWI-POD에 대한 소유자 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. GREEN LOO KIWI-POD 10 페이지. Dry composting toilet

4
Vent System General Considerations
The Kiwi Pod airflow requirement is provided by 65mm and 100mm pipe and incorporates a
continuous running fan (installed with housing). Consider how the fan will be powered (240VAC or
12VDC) and ensure the fan housing is accessible for maintenance. Ensure correct airflow of the fan
away from the toilet at all times.
Remember that warm air from the composting chamber (the composting process generates its own
warmth) naturally rises, and that sharp bends restrict airflow – designing the vent piping correctly
will improve natural operation.
Warm air holding moisture entering a cold vent can result in condensation. Consider insulating the
outlet vent piping and checking your moisture (condensate) trap regularly.
VENT PIPE INSTALLATION
The ventilation pipe should rise perpendicularly with as few curves and elbows as possible, the vent
cowl placed on top. Don't use pipe cement on the fan housing.