GREEN LOO KIWI-POD 소유자 설치 및 운영 매뉴얼 - 페이지 3

{카테고리_이름} GREEN LOO KIWI-POD에 대한 소유자 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. GREEN LOO KIWI-POD 10 페이지. Dry composting toilet

Preparing the Excess Liquid absorption Trench
A lot of the liquid waste is used up in the composting process, as well as being evaporated through
the vent system. An absorption trench is required to deal with any excess liquid. The length of the
trench is 1 m for the Kiwi Pod servicing 2 people, or 2m for the Kiwi Pod with 2 extra chambers,
servicing 4 people. The trench is to be 400mm wide, 400mm deep.
However, dimensions must not be less than required by Regulation 50 of the Health (Treatment of
Sewage and Disposal of Effluent and Liquid Waste) Regulations 1974 or AS/NZS 1547. See diagram
for an installation below.

1. INSTALLATION

The first thing to do is to decide where in the toilet room you want to place the Kiwi Pod. Ensure you
have an outside facing wall at the back of the Kiwi Pod for ventilation and the excess liquids drain.
Once you have found the right spot in the toilet room, either glue the Kiwi Pod to the floor using
silicone or similar – or drill 4 small holes through the bottom of the Kiwi Pod base and into the floor
– affix with suitable screws or fixings. Affix screws at the outer edge of the base – Do not screw
through the liquids collection plate in the center! See suggestions below:
3