GREEN LOO KIWI-POD Посібник користувача з монтажу та експлуатації - Сторінка 3
Переглянути онлайн або завантажити pdf Посібник користувача з монтажу та експлуатації для Туалети GREEN LOO KIWI-POD. GREEN LOO KIWI-POD 10 сторінок. Dry composting toilet
Preparing the Excess Liquid absorption Trench
A lot of the liquid waste is used up in the composting process, as well as being evaporated through
the vent system. An absorption trench is required to deal with any excess liquid. The length of the
trench is 1 m for the Kiwi Pod servicing 2 people, or 2m for the Kiwi Pod with 2 extra chambers,
servicing 4 people. The trench is to be 400mm wide, 400mm deep.
However, dimensions must not be less than required by Regulation 50 of the Health (Treatment of
Sewage and Disposal of Effluent and Liquid Waste) Regulations 1974 or AS/NZS 1547. See diagram
for an installation below.
1. INSTALLATION
The first thing to do is to decide where in the toilet room you want to place the Kiwi Pod. Ensure you
have an outside facing wall at the back of the Kiwi Pod for ventilation and the excess liquids drain.
Once you have found the right spot in the toilet room, either glue the Kiwi Pod to the floor using
silicone or similar – or drill 4 small holes through the bottom of the Kiwi Pod base and into the floor
– affix with suitable screws or fixings. Affix screws at the outer edge of the base – Do not screw
through the liquids collection plate in the center! See suggestions below:
3