GAP SUPER C 설치 및 조립 지침 - 페이지 10
{카테고리_이름} GAP SUPER C에 대한 설치 및 조립 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. GAP SUPER C 17 페이지.
beam with the 1/8" holes. Install 14 clips to hold the mesh as shown below. When applying the clips keep the mesh taut to
obtain a flat surface mesh. A flat surface looks nice, but electrically it doesn't matter
B. Locate the two 24" x 23 ½ " mesh pieces. Place them over the 24" x 24" frame. In so doing you will place
one edge over the mesh already covering the 1/8" holes. Refer to the figure below.
D. Now locate the 5/16" stainless steel hex self-tapping screws and washers. Secure both meshes to the
box beams, using the screws, washers and nut driver supplied. A total of 20 screws are required.