Jandy Pro Series K-2000 설치 및 운영 매뉴얼 - 페이지 9

{카테고리_이름} Jandy Pro Series K-2000에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Jandy Pro Series K-2000 20 페이지. Electronic water leveler

Jandy Pro Series Levolor
II Electronic Water Leveler
®
Models K-2000
3.5

Installing the Valve and Relay

NOTE Install the valve with the directional water flow
arrow pointing in the appropriate direction. The
directional water flow arrow is located on the
inlet side of the valve.
A 24VAC solenoid valve will provide water from a
supply line to the pool. You can install the supply line
either before or after the filter at the equipment pad or
on a dedicated line back to the pool.
Zodiac recommends a minimum ¾" valve and an anti-
siphon valve, which provides inexpensive insurance
against accidental draining of the pool.
Always use an in-line strainer, which can be purchased
from Zodiac.
1.
Connect the 24VAC water solenoid valve to the
18-gauge solid-core burial cable using the supplied
grease-filled wire nuts.
2.
Connect the wires from the Fill Valve to the blue
wires in the control box using wire nuts. See
Figure 7, Control Box Wiring, on page 10.
3.
Connect the wires from the High Level DC Relay
to the gray wire (-) and the red wire (+) in the
control box using wire nuts. See Figure 7, Control
Box Wiring, on page 10.
4.
Turn the flow control knob (+) on the top of the
valve (See Figure 5) to set the flow rate to your
specifications. (The rate can be set up to 30 GPM.)
5.
Put the manual ON/OFF lever, located just below
the solenoid, in the OFF position, so it can only
be opened with the electronic water Levolor. See
Figure 6.
|
Installation and Operation Manual
Figure 5. Valve Flow Controller
ON
Manual
On/Off Lever
Manual Filling
Figure 6. Manual Valve Lever
Page 9
ENGLISH
Flow Control
OFF
Manual
On/Off Lever
Controlled Filling