Fronius 63A-1 빠른 시작 매뉴얼 - 페이지 8

{카테고리_이름} Fronius 63A-1에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Fronius 63A-1 10 페이지. Smart meter
Fronius 63A-1에 대해서도 마찬가지입니다: 빠른 매뉴얼 (17 페이지), 빠른 매뉴얼 (20 페이지), 빠른 시작 매뉴얼 (2 페이지), 빠른 시작 매뉴얼 (2 페이지), 빠른 시작 매뉴얼 (8 페이지)

Fronius 63A-1 빠른 시작 매뉴얼
Wiring detail for 3-Phase Smart Meter 63A/3PH and Datamanager V2
Wiring detail for Single Phase Smart Meter 63A/1PH*** and Fronius Datamanager V2
Modbus termination switch on the Datamanager
The internal bus termination 120-Ohm resistance (for Modbus RTU) needs to
be switched to ON to be activated.
Please Note:
The termination resistance must be activated for the first and last device in an
RS-485 bus.
(c) Fronius Australia Pty. Ltd, 2015
(Diagram 5)
(Diagram 6)
* The 120 Ohm terminating
resistor comes with the
meter
** It is important to connect
the Neutral.
* The 120 Ohm terminating
resistor comes with the meter
*** Please note that the
connections 33, 34, 35 on the
Fronius Smart Meter are in
reverse order to those shown
in diagram 6!
8/10