KitchenAid KHHC2090SBL3 설치 지침 매뉴얼 - 페이지 8

{카테고리_이름} KitchenAid KHHC2090SBL3에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. KitchenAid KHHC2090SBL3 12 페이지. Microwave hood combination

NOTE: Secure the mounting
plate to the wall at both end holes
drilled into the wall studs and/or
drywall using either 1/4-20 x 3"
round-head
bolts and toggle nuts or 1/4 x 2" lag screws.
Refer to illustrations
in "Possible
Wall Stud Configurations"
in
"Locate Wall Stud(s)" section.
No Wall Studs at End Holes (Figures I and 2)
NOTE: The mounting plate must be secured to the wall on at least
1 wall stud as well as at both ends.
1. With the support tabs of the mounting plate facing forward,
insert 1/4-20 x 3" round-head bolts through both end holes of
mounting plate.
2. Start toggle nuts on bolts from the back of the mounting plate.
Leave enough space for the toggle nuts to go through the wall
and to open.
A
A. 1/4-20 x 3" round-head
bolt
B. Mounting plate
C. Spring toggle nut
3=
4.
Position mounting plate on the wall.
Push the 2 bolts with toggle nuts through the drywall, and
finger tighten the bolts to make sure toggle nuts have opened
against drywall.
.
°
//
//
//
A .............
_
_//
//
B ............................................................................
//
//
//
//
A. 1/4-20 x 3" round-head bolt
B. Mounting plate
D
C. Spring toggle nut
D. Drywall
5=
Insert lag screw(s) into the hole(s) drilled into wall stud(s) in
Step 2 of "Installation for No Wall Studs at End Holes" in the
"Drill Holes in Rear Wall" section.
6. Check alignment of mounting plate, making sure it is level.
7. Securely tighten all lag screws and bolts.
Wall Stud at One End Hole (Figure 3)
1.
With the support tabs of the mounting plate facing forward,
insert a 1/4-20 x 3" round-head bolt through the end hole that
fits over the 3/4" (19 mm) hole drilled in Step 3 of "Installation
for Wall Stud at One End Hole" in the "Drill Holes in Rear Wall"
section.
2. Start a toggle nut on the bolt from the back of the mounting
plate. Leave enough space for the toggle nut to go through
the wall and to open.
3. Position mounting plate on the wall.
4. Push the bolt with toggle nut through the drywall, and finger
tighten the bolt to make sure toggle nut has opened against
drywall.
5=
6.
Insert a lag screw into the remaining end hole.
If installing on a second wall stud, insert a lag screw into the
other hole drilled in Step 2 of "Installation for Wall Stud at One
End Hole" in the "Drill Holes in Rear Wall" section.
7. Check alignment of mounting plate, making sure it is level.
8. Securely tighten the lag screw(s) and bolt.
Wall Studs at Both End Holes (Figure 4)
1. Position mounting plate on the wall.
2. Insert lag screws into both end holes.
3. Check alignment of mounting plate, making sure it is level.
4. Securely tighten the lag screws.
1=
2.
3.
Disconnect
power to outlet.
Remove
all contents
from upper cabinet.
Place Upper Cabinet Template
against the bottom of the
upper cabinet,
and tape or tack it in place. Make sure the
template
centerline
aligns with the vertical centerline
on the
rear wall.
The "rear wall" arrows must be against the rear wall so that the
holes cut into the upper cabinet align with the holes in the top
of the microwave oven.
NOTES:
If the upper cabinet has a frame around it, trim the template
edges so that it fits inside the frame, against the upper cabinet
bottom. The template has trim lines to use as guides.
4=
If the wall behind the microwave oven (as installed) has a
partial wall covering (for example, tile backsplash), be sure the
"Rear Wall" arrows align to the thickest part of the rear wall
(for example, the thickness of the tiles rather than the drywall).
Make sure the 10W' (26.7 cm) dimension from the rear wall to
points "D" and "E" on the template is maintained.
/
O
O
5. Cut the 1_/2"(3.8 cm) diameter hole at the circular shaded area
"G" on the template. This hole is for the power supply cord.
NOTE: If upper cabinet is metal, the supply cord bushing needs to
be installed around the supply cord hole, as shown.
B
6=
A. Metal cabinet
B. Power supply cord bushing
Drill 3/8" (10 mm) holes at points "D" and "E" on the template.
These are for two 1/4-20 x 3" bolts and washers used to
secure the microwave oven to the upper cabinet.
8