Alien green Mostat 설치 설명서 지침 - 페이지 5

{카테고리_이름} Alien green Mostat에 대한 설치 설명서 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Alien green Mostat 15 페이지.

INSTALLATION

Setting up the process control block (PCB) in the central heating boiler
CAUTION: Before starting the work, please make sure that the boiler is NOT supplied with voltage power!
!
Unpack the
process control block
(PCB).
Open the boiler so that you can reach the printed circuit board.
(If necessary, use the instructions for the boiler).
04