a-gear P1004T EPON 하드웨어 설치 매뉴얼 - 페이지 8

{카테고리_이름} a-gear P1004T EPON에 대한 하드웨어 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. a-gear P1004T EPON 13 페이지. Optical network unit

A-GEAR World Wide Manufacturing
2.3. 3.
R a c k Co n f ig u r at i o n
The following content helps you design a suitable rack configuration.
• Each equipment on the rack will emit heat during working. To ensure good ventilation,
closed rack must be provided with heat dispersion port and cooling fan, and equipment
should be closely placed from each other;
• When installing equipment on the open rack, pay attention not to make the rack frame
obstruct the vent holes of EPON access device. Please carefully check the equipment
location after the equipment is installed to avoid such case.
• Ensure that effective ventilation measure has been provided for the equipment installed
at the lower part of the rack.
2.3. 4.
Powe r S u pp l y Con s id e r at io n
Check power supply. Ensure that power supply system is well grounded. Input voltage
range should be AC110V~240V. Too high voltage will damage the machine.
Warning:
If the power supply system is not well grounded, or input power fluctuates greatly with excessive pulse, false code
rate of the communication equipment will increase, or even hardware system will be damaged!
2.4.
I ns ta l l at i on to o l s a n d e q u ip m e nt
Tools and equipment required for installation of A-GEAR P1004T EPON are not included in
standard configuration of A-GEAR P1004T EPON. User needs to prepare them by himself.
The following are typical tools and equipment required for installation of A-GEAR P1004T
EPON:
• Screw driver
• Anti-static hand ring
• Fastening screws
• Ethernet cable
• Other Ethernet terminal equipment
• Control terminal
A-GEAR P1004T EPON Optical Network Unit (ONU)
datasheet
a-gear.net
Раge 8 of 13