Fujitsu ETERNUS AX Series 설치 - 페이지 6

{카테고리_이름} Fujitsu ETERNUS AX Series에 대한 설치을 온라인으로 검색하거나 PDF를 다운로드하세요. Fujitsu ETERNUS AX Series 9 페이지. Installing a cisco nexus 9336c-fx2 switch and pass-through panel in a cabinet, for cisco nexus 9336c-fx2 switches
Fujitsu ETERNUS AX Series에 대해서도 마찬가지입니다: 빠른 시작 매뉴얼 (8 페이지)

Fujitsu ETERNUS AX Series 설치
1. With one person holding the front of the chassis level, the other person should fully tighten the four
rear screws to the cabinet posts.
c) With the chassis now supported without assistance, fully tighten the front screws to the posts.
d) Repeat steps
5a
through
Note: By using the fully installed switch as a support, it is not necessary to hold the front of the second
switch during the installation process.
6. When the switches are installed, connect the jumper cords to the switch power inlets.
7. Connect the male plugs of both jumper cords to the closest available PDU outlets.
Note: To maintain redundancy, the two cords must be connected to different PDUs.
8. Connect the management port on each 9336C-FX2 switch to either of the management switches (if
ordered) or connect them directly to your management network.
The management port is the upper-right port located on the PSU side of the switch. The CAT6 cable for
each switch needs to be routed through the pass-through panel after the switches are installed to connect
to the management switches or management network.
 | Installing a Cisco Nexus 9336C-FX2 switch and pass-through panel in a Fujitsu cabinet |
5c
for the second switch at the RU42 location.
6