Kohler K-1184 설치 매뉴얼 - 페이지 4
{카테고리_이름} Kohler K-1184에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler K-1184 17 페이지. Flanged acrylic bath with integral apron
Kohler K-1184에 대해서도 마찬가지입니다: 설치 및 관리 매뉴얼 (29 페이지), 설치 및 관리 매뉴얼 (25 페이지), 설치 매뉴얼 (21 페이지)
Clear spaces
for support
blocks.
3. Secure the Bath to the Subfloor
CAUTION: Risk of product damage. Do not support the bath by the rim.
Choose the installation option that best applies to your particular installation.
If the subfloor is not level, shim the bath support blocks as necessary.
Option 1: Secure Using Cement or Mortar Bed
Spread a 2" (5.1 cm) thick layer of cement or mortar on the subfloor where the bath will be placed.
This will help secure, level and support the bath.
NOTE: The support blocks must rest directly on the support floor.
Clear all the material away from the support block locations.
NOTE: Do not use gypsum cement or drywall compound for this application, as they will not provide an
acceptable, durable bond.
Position a piece of plastic drop cloth or similar material over the cement or mortar bed.
With help, carefully lift the bath into place and make sure the support blocks do not rest in the bed
material. Verify that the bath is level and resting on all support blocks.
Insert the drain tailpiece into the trap.
NOTE: An access panel will simplify future maintenance.
Option 2: Secure Using Construction Adhesive
Apply a generous amount of high-quality construction adhesive to the bottom of the support blocks.
With help, carefully lift the bath into place and verify it is level and resting on all support blocks.
Insert the drain tailpiece into the trap.
NOTE: An access panel will simplify future maintenance.
Option 3: Secure Using Silicone Sealant
With help, carefully lift the bath into position.
Insert the drain tailpiece into the trap.
Verify that the bath is level and resting on all support blocks.
Apply a continuous bead of silicone sealant around the entire rim of the bath.
NOTE: An access panel will simplify future maintenance.
1014128-2-D
Apply a bead of
silicone sealant
around the entire rim
Spread a 2"
(5.1 cm) layer
or
of cement or
mortar bed
Apply construction
material.
adhesive to the
support blocks.
4
Kohler Co.