Kohler HYDRO-TOWER 300 설치 지침 - 페이지 16

{카테고리_이름} Kohler HYDRO-TOWER 300에 대한 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler HYDRO-TOWER 300 27 페이지. Floor standing toilet
Kohler HYDRO-TOWER 300에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (18 페이지)

Kohler HYDRO-TOWER 300 설치 지침
2. Tighten the long screw into the holes of the tank bracket
and cover the drainage hole with the big cap, cover the
inlet hole with the small cap.
2.
3. Connect tap water braided tube on the top of water tank for
water supply as shown.
Note: 1. Ensure water tank internal valve is OFF.
2. Suggestion: connect a temporary rubber or plastic
hose on valve, flush water supply pipeline. Ensure
water is clean, no residual sand stone or fouling
inside pipeline.
3.
1.
2.
4. Install rectangle cover
1) Install the rectangular shield in the block screen of the
tank, and tighten the screw to fix mask to the tank.
4.
1)
C. Installation of P-trap
C.
1. Insert drainage pipe with inner diameter
drain elbow and weld.
1.
1263048-T01-D
110mm into
110mm
Inlet Hole
Drainage Hole
Connecting Pipe
Protective Cover
-8-
Tank Bracket
Small Cap
Long Screw
Big Cap
Water Pipe
Mask
Screw
Water Tank
Water Tank Bracket
Drainage Pipe