Kohler HYDRO-TOWER 300 설치 지침 - 페이지 17

{카테고리_이름} Kohler HYDRO-TOWER 300에 대한 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler HYDRO-TOWER 300 27 페이지. Floor standing toilet
Kohler HYDRO-TOWER 300에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (18 페이지)

Kohler HYDRO-TOWER 300 설치 지침
2. Tighten the long screw into the holes of the tank bracket
and cover the drainage hole with the big cap, cover the
inlet hole with the small cap.
2.
3. When finishing the brickwork of the wall, take out the big
and small caps, and eliminate unwanted mask with a sharp
knife.
Note:
When building the wall, the product cannot be cast
and filled by cement or be squeezed.
3.
D. Installation of Toilet
D.
1. Install the inlet pipe to the lavatory as shown, and mark on
the pipes at the back side of the tank with a ruler and a
pencil, and reserve appropriate space according to the
distance from the back of the tank to the inlet hole on the
wall.
1.
2. Eliminate unwanted part of the inlet pipe according to the
marks of reserved space ,and rasp a smooth surface with
files.
2.
1263048-T01-D
Inlet Hole
Drainage Hole
Big Cap
Big Cap
Inlet Pipe
Drainage Pipe
Reserved Space
Drainage Pipe
-9-
Small Cap
Long Screw
Tank Bracket
Mask
Small Cap
Inlet Pipe