Aqua Creek F-03EZPL 설치, 조립 및 작동 지침 - 페이지 7
{카테고리_이름} Aqua Creek F-03EZPL에 대한 설치, 조립 및 작동 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Aqua Creek F-03EZPL 12 페이지. Ez pool lift
ASSEMBLY INSTRUCTIONS – EZ POOL LIFT
9/16" Wrench
The EZ Pool Lift arrives with the boom arm attached to the mast. To complete the
assembly, layout all parts needed on a large clean
area.
STEP 1:
Locate the Hydraulic ram and attach the upper end
of the hydraulic ram to the boom with one
(1) 3/8" x 1-3/4" hex head bolt, two (2) 3/8" flat
washers, and one (1) 3/8" nylock nut.
STEP 2:
Connect the lower end of the hydraulic ram to the
mast with one (1) 3/8" x 1-3/4" hex head bolt, two
(2) 3/8" flat washers, and one (1) 3/8" nylock nut.
MAKE SURE THAT THE 3/8" ROD END IS ALWAYS
FULLY SEATED WITH THE MAXIMUM ALLOWABLE
THREAD BEING USED.
STEP 3:
Install lift into previously installed anchor socket in the pool deck. Make sure that the mast
is seated at the bottom of the anchor. Check to ensure easy rotation of the lift in nylon-
lined anchor sleeve.
STEP 4:
Locate the four (4) internal sling support bars
and insert them into the sewn pockets in the
mesh sling.
EZINST-6/27/14
REQUIRED TOOLS
3/4" Wrench
!WARNING!
© Aqua Creek Products LLC 2003-2014
INTERNAL SLING
SUPPORT BAR
STEP 4
Page 7 of 12