Aqua Creek F-03EZPL Installatie-, montage- en bedieningsinstructies - Pagina 7

Blader online of download pdf Installatie-, montage- en bedieningsinstructies voor {categorie_naam} Aqua Creek F-03EZPL. Aqua Creek F-03EZPL 12 pagina's. Ez pool lift

ASSEMBLY INSTRUCTIONS – EZ POOL LIFT
9/16" Wrench
The EZ Pool Lift arrives with the boom arm attached to the mast. To complete the
assembly, layout all parts needed on a large clean
area.
STEP 1:
Locate the Hydraulic ram and attach the upper end
of the hydraulic ram to the boom with one
(1) 3/8" x 1-3/4" hex head bolt, two (2) 3/8" flat
washers, and one (1) 3/8" nylock nut.
STEP 2:
Connect the lower end of the hydraulic ram to the
mast with one (1) 3/8" x 1-3/4" hex head bolt, two
(2) 3/8" flat washers, and one (1) 3/8" nylock nut.
MAKE SURE THAT THE 3/8" ROD END IS ALWAYS
FULLY SEATED WITH THE MAXIMUM ALLOWABLE
THREAD BEING USED.
STEP 3:
Install lift into previously installed anchor socket in the pool deck. Make sure that the mast
is seated at the bottom of the anchor. Check to ensure easy rotation of the lift in nylon-
lined anchor sleeve.
STEP 4:
Locate the four (4) internal sling support bars
and insert them into the sewn pockets in the
mesh sling.
EZINST-6/27/14
REQUIRED TOOLS
3/4" Wrench
!WARNING!
© Aqua Creek Products LLC 2003-2014
INTERNAL SLING
SUPPORT BAR
STEP 4
Page 7 of 12