Avlite AV-BSBL 빠른 시작 매뉴얼 - 페이지 2

{카테고리_이름} Avlite AV-BSBL에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Avlite AV-BSBL 4 페이지.

Step 5: Assemble Stanchions
a.
Thread frangible coupling into the threaded flange.
b. Thread support leg into the other end of frangible
coupling.
c.
Repeat steps for second stanchion.
Step 7: Set Up Barrette
a.
Flip entire Barrette assembly over so it is supported
by the stanchions.
b. Place Barrette in desired location.
c.
Place a stake outside the threaded flange of the
stanchion.
d. Use a mallet to pound the stake at an angle into the
ground to keep the Barrette upright.
e.
Repeat on opposite side of the stanchion.
f.
Repeat steps to stake other stanchion.
Head Office
+61 (0)3 5977 6128
Support Leg
Frangible Coupling
Threaded Flange
Avlite USA
Avlite Asia
+1 (603) 737 1311
+65 9119 8770
Step 6: Insert Stanchion on Barrette
a.
Flip stanchion upside down.
b. Insert the stanchion into the mounting cap.
c.
Tighten the coupling in an upward motion until
secured to the mounting cap.
d. Repeat on other side.
Step 8: Set Up Tie-Down Stakes
a.
Insert tie-down stake into the ground
approximately 6-7 feet from one of the stanchions
on the front side of the Barrette.
b. Use a mallet to pound a stake securely into the
ground.
c.
Repeat steps from the back side of the Barrette.
d. Repeat steps on the opposite side.
General Enquiries