AAxeon FCM-CHS2 Series 사용자 설명서 - 페이지 10

{카테고리_이름} AAxeon FCM-CHS2 Series에 대한 사용자 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. AAxeon FCM-CHS2 Series 16 페이지. 16-slot in-band management chassis

2.3 Install Slide-In Modules
CAUTION
To prevent any Slide-In Module damage or failure, please wear a grounding
device and observe electrostatic discharge precautions before installing
into the In-Band Management Chassis.
Procedure
1. Plan the slide-in module slot position
-
-
2. Remove the protective plate from selected installation slot
3. Insert slide-in module carefully into the selected slot
-
4. Screw in modules.
5. Repeat steps 2 to 4 for all Slide-in modules.
Power Modules
Media
Conversion
Center
E-MCC-1600
Power
In Use
Power
In Use
1
2
Management
Module
All slots are identical
Slide-in module can be installed into any slot
Make sure that the slide-in module is firmly connected with
the back plane connector.
10