AAxeon FCM-CHS2 Series Panduan Pengguna - Halaman 10

Jelajahi secara online atau unduh pdf Panduan Pengguna untuk Sasis AAxeon FCM-CHS2 Series. AAxeon FCM-CHS2 Series 16 halaman. 16-slot in-band management chassis

2.3 Install Slide-In Modules
CAUTION
To prevent any Slide-In Module damage or failure, please wear a grounding
device and observe electrostatic discharge precautions before installing
into the In-Band Management Chassis.
Procedure
1. Plan the slide-in module slot position
-
-
2. Remove the protective plate from selected installation slot
3. Insert slide-in module carefully into the selected slot
-
4. Screw in modules.
5. Repeat steps 2 to 4 for all Slide-in modules.
Power Modules
Media
Conversion
Center
E-MCC-1600
Power
In Use
Power
In Use
1
2
Management
Module
All slots are identical
Slide-in module can be installed into any slot
Make sure that the slide-in module is firmly connected with
the back plane connector.
10