AAxeon FCM-CHS2 Series Panduan Pengguna - Halaman 9
Jelajahi secara online atau unduh pdf Panduan Pengguna untuk Sasis AAxeon FCM-CHS2 Series. AAxeon FCM-CHS2 Series 16 halaman. 16-slot in-band management chassis
2. INSTALLATION
The procedures for installing the In-Band Management Chassis is as follows,
2.1 Requirement
2.2 Unpacking the In-Band Management Chassis
2.3 Install slide-in modules
2.4 Install the In-Band Management Chassis
2.5 Connect slide-in modules to network
2.6 Connect Redundant Power Supply (Optional)
2.7 Power on the In-Band Management Chassis
2.1 Requirement
The In-Band Management Chassis basic requirements for installation are as
follows.
• Environmental conditions.
-
One power outlet for the In-Band Management Chassis internal
power supply
One power outlet for a Redundant Power Supply (if ordered)
-
Proper ventilation
-
UTP cables should not run in the same duct as the power and
-
phone line cables
• Required fiber conversion slide-in modules
• Required Fiber and UTP cables
• Redundant Power Supply (optional)
• Rack mounting tools
2.2 Unpacking the In-Band Management Chassis
The following items should be checked after opening the shipping package.
1. In-Band Management Chassis
2. Power Cord
3. User's Guide (CD-ROM)
4. Slide-In Converter Modules (optional)
5. Redundant Power Supply (optional)
9