Aqua Creek Products F-004PLB-XR 매뉴얼 - 페이지 8

{카테고리_이름} Aqua Creek Products F-004PLB-XR에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Aqua Creek Products F-004PLB-XR 20 페이지.

Anchor Installation: New Construction

For new pool deck installations, the footing for the pool lift should be at least 3'-6" x 3-6" x 6" deep.
It should be reinforced with one mat of four (4) #4 reinforcing bars (rebar) that are 2" clear from
the top of the new pour. (Reinforcing mesh can be used instead of rebar - check the local code
requirements. See drawing below).
FIGURE 7
The footing for the lift should be tied into the rest of the pool deck on three sides with the rebar
or reinforcing mesh. (Do not tie into the bond beam). The rest of the pool deck can be a typical 4"
thick or thickened per local code requirements. Bond rebar or reinforcing mesh grid according to
local requirements and also bond the anchor system to the rebar/mesh grid.
8
Copyright © 2014 Aqua Creek Products All Rights Reserved
Revised 11/20/14
V.1.1