CPA YUI 유지 관리 매뉴얼 - 페이지 9
{카테고리_이름} CPA YUI에 대한 유지 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. CPA YUI 16 페이지. Hidromassage tub

MAINTENANCE MANUAL
Drain drain
with siphon
(recommende
d)
Hole for aeration and passive
ventilation (⌀ 100)
HYDRAULIC PREPARATIONS
Make a water connection with a dedicated line to the hot tub (do not connect other
equipment to the same connection) and made with new and never used hoses and joints.
For loading it is recommended to use mains water (aqueduct) as it guarantees
microbiological purity and the absence of metal particles (not retained by the filtering
system) or organic substances. The use of well water is strongly discouraged, as it may
contain substances that can cause the proliferation of algae, stains and serious damage to
the hot tub. If the water service is not reached, install filters (filtration not less than 50
microns) and metal subtractors upstream of the loading line that guarantee characteristics
comparable to those of the water supplied by the aqueduct. Failure to install systems that
ensure an adequate level of the quality of the loading water determines the discharge of any
liability arising from the failure to install the latter.
www.cpa-piscine.it
Hole for aeration and
passive ventilation (⌀ 100)
Thecnical
room L > 50
cm
Underground arrangement for
loading and unloading connections
YUI
pag. 9 di 16
Containment septum thrust
of the land
Concrete basement
(raccomended)
Ver 01 – 2021-07-09