Allied Telesis SwitchBlade AT-SB4104-80 빠른 설치 매뉴얼 - 페이지 7
{카테고리_이름} Allied Telesis SwitchBlade AT-SB4104-80에 대한 빠른 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Allied Telesis SwitchBlade AT-SB4104-80 11 페이지. Switchblade chassis and fan tray
Quick Install Guide
C613-04029-01 REV C
7.
Secure the blank faceplates
Press each faceplate home (until its front panel engages, or nearly engages,
the threaded holes inside the chassis).
Use the captive Phillips screws to secure each faceplate to the chassis (two
screws per faceplate).
Secure blank faceplates to all switch controller and line card bays that will not have
controllers or cards installed. The faceplates prevent dust and debris from entering the
switch and maintain proper airflow.
The switch may overheat or be damaged by dust and debris if bays are left
uncovered.
Fan Tray Package Contents
If you purchased a SwitchBlade chassis, the fan tray will be pre-installed in the
chassis.
If you purchased a SwitchBlade fan tray without also purchasing a
SwitchBlade chassis, the following items are included with each fan tray.
■
One fan tray.
■
One SwitchBlade Chassis and Fan Tray Quick Install Guide.
■
One warranty card.
Related items that can be purchased separately:
■
Blank faceplates for fan tray bays (AT-SB4191 for the SwitchBlade 8 or
AT-SB4194 for the SwitchBlade 4).
Contact your sales representative if any items are damaged or missing.
Installing A Fan Tray
Fan trays can be hot swapped. The switch will continue to operate for brief periods while
fan trays are exchanged.
Do not operate the switch for extended periods without an operational fan tray.
Doing so will cause the switch to overheat and shut down, and may also
damage the switch, switch controllers and line cards.
7