Avtec TAKU Premier Ventilation 운영자 매뉴얼 - 페이지 6
{카테고리_이름} Avtec TAKU Premier Ventilation에 대한 운영자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Avtec TAKU Premier Ventilation 12 페이지. Premier ventilation
EXHAUST FAN & DUCT
6
888-994-7636
Installation Instructions
1. Check all local codes prior to installation.
2. All exhaust fans are supplied with a hinge kit and grease box.
3. The exhaust fan curb should be installed directly above the hood if possible.
Always maintain the shortest duct run possible.
4. Cut hole and seal exhaust fan curb to roof.
5. Duct shall be sized to provide air velocities not exceeding 1200 FPM.
6. Install hinges and airline cable on exhaust fan cap and metal curb. Remember to
leave ample room for fan to tilt back. Fan will remain in tilted back position.
7. Install grease collection box on side of fan that has grease tube discharge.
8. The exhaust duct must be constructed of 16 gauge carbon steel or 18 gauge stainless
steel. All seems must be fluid welded.
9. A duct transition should be provided below exhaust fan inlet.
10. The exhaust duct must be fluid welded to hood collar.
11. Make all necessary electrical connections and check fan for proper rotation.
NOTE: Fan will exhaust air running in wrong direction.