Dell Force10 S25-01-GE-24P 매뉴얼 - 페이지 20

{카테고리_이름} Dell Force10 S25-01-GE-24P에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell Force10 S25-01-GE-24P 48 페이지. Installing the s25p system
Dell Force10 S25-01-GE-24P에 대해서도 마찬가지입니다: 구성 매뉴얼 (8 페이지)

Dell Force10 S25-01-GE-24P 매뉴얼

Four-Post Rack-mounting with Threaded Rails

Ensure that there is adequate clearance surrounding the cabinet or rack to permit access and airflow. If you
are installing two S25P switches side-by-side, position the two S25P chassis at least 5 inches (12.7 cm)
apart to permit proper airflow. Follow the steps below to install a switch into a 4-post 19-inch equipment
rack, using the attached front mounting brackets and the optional adjustable rear-mounting brackets.
Step
Task
Align the three screw holes of the adjustable rear mounting bracket with the three holes in the S25P chassis, and
1
secure the mounting bracket with three screws.
Figure 7 Four-Post Rack-mounting with Threaded Rails
2
Insert the S25P into the rack, and secure the chassis to the front post with two screws. Then secure the chassis to
the rear posts with two screws.
Figure 8 Four-Post Rack-mounting with Threaded Rails .
20
Installing the S25P