Dell Force10 S25-01-GE-24P 매뉴얼 - 페이지 23

{카테고리_이름} Dell Force10 S25-01-GE-24P에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell Force10 S25-01-GE-24P 48 페이지. Installing the s25p system
Dell Force10 S25-01-GE-24P에 대해서도 마찬가지입니다: 구성 매뉴얼 (8 페이지)

Dell Force10 S25-01-GE-24P 매뉴얼
Step
Task
4
Position the cage nuts over the holes on each bracket flange and each rack post.
Figure 12 Four-Post Rack-mounting with Cage Nuts
5
Align the rack filler panel to the rear bracket and rack posts. Secure by inserting two screws into the hole in the
filler panel through to the holes in the rack post.
Figure 13 Four-Post Rack-mounting with Cage Nuts
Installing the S25P System
23