Dell Force10 S25-01-GE-24P Handmatig - Pagina 23
Blader online of download pdf Handmatig voor {categorie_naam} Dell Force10 S25-01-GE-24P. Dell Force10 S25-01-GE-24P 48 pagina's. Installing the s25p system
Ook voor Dell Force10 S25-01-GE-24P: Configuratiehandleiding (8 pagina's)
Step
Task
4
Position the cage nuts over the holes on each bracket flange and each rack post.
Figure 12 Four-Post Rack-mounting with Cage Nuts
5
Align the rack filler panel to the rear bracket and rack posts. Secure by inserting two screws into the hole in the
filler panel through to the holes in the rack post.
Figure 13 Four-Post Rack-mounting with Cage Nuts
Installing the S25P System
23