Dell PowerEdge R520 매뉴얼 - 페이지 6
{카테고리_이름} Dell PowerEdge R520에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell PowerEdge R520 11 페이지. 2-socket, 2u rack server
Dell PowerEdge R520에 대해서도 마찬가지입니다: 설치 매뉴얼 (8 페이지), 시작하기 매뉴얼 (9 페이지), 포트폴리오 매뉴얼 (27 페이지), 기술 매뉴얼 (50 페이지)
Cable Routing Procedures for the Dell PowerEdge R520 System
Figure 4.
1.3.2. Left-side mounting instructions
1. Install the CMA on the rear left side of the rails by attaching both CMA housings to the attachment
brackets on the rails.
2. Route the cables through the CMA while avoiding twisting the cables. Use the hook-and-loop straps
on the CMA to secure the cables.
3. If the cable bundle includes a keyboard, video, and mouse system interface pod (KVM SIP), it can
be placed inside the CMA basket when the CMA is mounted on the left side. See Figure 5.
4. Once you have routed all of the cables through the CMA, dress the cable slack between the back of
the system and the entrance of the CMA using the tie wraps provided in the CMA kit.
5. Clip off the excess length of material from the tie wraps. Make sure that the heads of the tie wraps
are positioned so as to avoid interference with adjacent systems. Return the CMA to the closed
(retracted) position.
Attaching the inner CMA attachment bracket
Figure 5.
Routing the cables through the CMA
NOTE: Do not store excess cable
slack inside the CMA. The cables
may protrude through the CMA, thus
causing binding and potentially
damaging the cables.
Cables entering the CMA should have a
small amount of slack to avoid cable
strain when the CMA is extended.
KVM SIP can be placed inside the
basket when the CMA is mounted on
the left side.
6