3 Day Blinds ARCH 조립/설치 지침 - 페이지 6

{카테고리_이름} 3 Day Blinds ARCH에 대한 조립/설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. 3 Day Blinds ARCH 8 페이지.

arch over an exISTInG BLInd InSTaLLaTIon
NOTE: If there is an existing blind in the brackets, remove the blind
before proceeding with the following step.
• Remove the arch from the window casing. Using a drill with
drill bit or an awl, make a small pilot hole at each pencil mark not
more than
• Arrange the remaining individual wood slats in order according to
size (large to small).
• Remove and discard the wood shims located in the bottom groove
of each vertical arch support.
/
" deep.
1
16
• Position the arch bottom rail
over the 2" wood blind
mounting brackets. The front
edge of the arch bottom rail
should be flush with the front
top edge of the bracket. The
bottom rail should be centered
in/over the window. Using a
pencil, mark two screw holes
through the bracket onto the
underside of the arch bottom
rail. Repeat for the other side of
the arch.
• Starting at the top of the arch
insert the remaining slats.
• Place the arch on top of the
mounting brackets and attach
the arch to the brackets using a
Phillips screwdriver and the
#6 X
/
1
screwing from the underside of
the brackets into the underside
of the arch bottom rail.
Page 5
inch screws by
2
/
"
1
16