3 Day Blinds METAL BLINDS Deluxe 매뉴얼

{카테고리_이름} 3 Day Blinds METAL BLINDS Deluxe에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. 3 Day Blinds METAL BLINDS Deluxe 6 페이지.

METAL BLINDS
Deluxe
OPTIONAL HARDWARE
GETTING STARTED
A few simple tools are required:
Level
Steel Tape Measure
Pencil
Hold Down Brackets
with Screws
Extension Bracket
Power Drill and
Flathead & Phillips
Awl (or tool for starting
End Mount Bracket
Screwdriver
Drill Bits
a screw hole)
Included in your order is all the hardware necessary for a
normal installation. Depending on the mounting surface,
fasteners other than the screws provided may be required.
Wall board and plaster require the use of anchors such as
expansion or toggle bolts. Bricks, tile and stone need special
Hex Machine
Spacers
Phillips Flat Head
Phillips Machine
plugs and drill bits. Wood should always be pre-drilled to
Nuts
(2 Spacers
Wood Screws
Screws
per Bracket)
avoid splitting.
Professional installation is also available in most areas,
call 800-800-3329.
STANDARD HARDWARE
Inside
Outside
Mounting Bracket
Mounting Bracket
or
and Screws
(over 60" wide 4 screws
per bracket supplies)
1
| 1" Metal Blinds Deluxe