360 Yield 360 Y-DROP HAGIE STS 100 사용 설명서 - 페이지 3

{카테고리_이름} 360 Yield 360 Y-DROP HAGIE STS 100에 대한 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. 360 Yield 360 Y-DROP HAGIE STS 100 11 페이지. Steel booms

ESTABLISH
I.
DROP LOCATIONS
Figures 1 and 2
Step 1
Locate the center of the machine and
identify the location of all the drops. On
the sprayer boom, mark where each riser
mount will be located. This will ensure
that the extension tubes will not interfere
with the riser mounts.
Figure 3
Step 2
From the center, measure out 51" (±5") on
either side, as shown in Figure 3.
NOTE: The center mounting position will
have to be offset in order to eliminate
conflict with the center riser mount.
Step 3
For the primary boom; starting at the
wing fold pivot pin, measure out and
make marks at 50", 104", 168", 223" and
272" (all measurements are ±5"). Repeat
for the other primary boom.
INSTRUCTIONS 360 Y-DROP
HAGIE STS 80', 90' & 100' STEEL BOOMS
Figure 1
Figure 2
Figure 3
360YIELDCENTER.COM
3