Miele AWG 102 설치 지침 매뉴얼 - 페이지 14
{카테고리_이름} Miele AWG 102에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Miele AWG 102 28 페이지. External motor roof installation
Miele AWG 102에 대해서도 마찬가지입니다: 운영 및 설치 매뉴얼 (24 페이지), 작동 및 설치 지침 (28 페이지), 설치 지침 매뉴얼 (28 페이지)
Installation
DDG 102
The DDG 102 is designed for
installation on an angled tile, slate or
shingle roof. The slope of the roof must
be at least 22° to prevent the ingress of
the elements, such as rain or snow.
Consult a roof tiler or roof plumber for
advice regarding other types of roofing.
Installation on a flat roof is not
possible.
Installation must only be carried out
by a qualified and competent person.
The external motor is connected to the
rangehood by means of a control cable
and is operated by the controls on the
rangehood.
14
Please refer to the operating and
installation instructions for the
rangehood before installing the
external motor and ducting.
The ducting collar on the external motor
has a diameter of 125 mm when the
appliance is supplied.
If exhaust ducting with a diameter of
150 mm is required, the front ring
of the collar must be cut at the join
with a sharp knife.