Miele DDG 102 설치 지침 매뉴얼 - 페이지 18

{카테고리_이름} Miele DDG 102에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Miele DDG 102 28 페이지. External motor roof installation
Miele DDG 102에 대해서도 마찬가지입니다: 운영 및 설치 매뉴얼 (24 페이지), 작동 및 설치 지침 (28 페이지), 설치 지침 매뉴얼 (28 페이지)

Miele DDG 102 설치 지침 매뉴얼
Installation
The ducting collar on the motor unit has
a diameter of 150 mm as standard.
If a diameter of 125 mm is required a
reducing collar must be used.
This is available to order from Miele.
 Push the flexible ducting onto the
collar and secure it with a hose clip.
 Ducting with a diameter of 150 mm is
then connected to the exhaust side.
If the exhaust air is to be ducted into
the open air, a telescopic wall vent kit
can be used. This is available to order
from Miele.
If the motor is installed vertically with
the exhaust ducting venting over a
roof, a roof vent kit DDF 125/150 or
similar must be used to prevent
rainwater from penetrating the
exhaust opening.
18
 Connect the control cable plug
connectors.
 Use the extension cable supplied to
lengthen the control cable if
necessary.
 If equipotential bonding is required,
connect the earth lead to the earthed
connection point  in the housing.
Equipotential bonding is required if
the control cable is to be extended
by more than the length of the
extension cable supplied (see
"Electrical connection").