Miele GAS COMBISET CS 1012 작동 및 설치 지침 - 페이지 39

{카테고리_이름} Miele GAS COMBISET CS 1012에 대한 작동 및 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Miele GAS COMBISET CS 1012 44 페이지. Double gas combiset
Miele GAS COMBISET CS 1012에 대해서도 마찬가지입니다: 작동 및 설치 지침 (44 페이지), 제품 치수 (4 페이지), 변환 지침 (40 페이지)

Miele GAS COMBISET CS 1012 작동 및 설치 지침
Installation and service must be
performed by a qualified installer,
service agency or the gas supplier.
In Massachusetts a licensed
plumber/gas fitter is required.
This appliance must be installed
with its own shut off valve and the
included gas pressure regulator.
Both the valve and the regulator
must be easily accessible to the
consumer to turn on or shut off the
gas supply after the appliance is
installed.
This appliance and its individual
shut off valve must be disconnected
from the gas supply during any
pressure testing performed in
excess of ½ psi (3.5 kPa), or
isolated from the gas line by closing
its individual manual shut off valve at
test pressures equal to or less than
½ psi (3.5 kPa).
Any pipe connections must be made
using a thread sealant approved for
gas connections. Failure to correctly
install these items could lead to a
gas leak and subsequent explosion.

Gas connection

The gas connection must be made
in accordance with local codes or, in
the absence of local codes, with
-
the National Fuel Gas Code,
ANSI Z 223.1/NFPA 54
for the USA
or
-
the current Can/CGA B 149.1
and .2 Installation Codes for gas
burning appliances for Canada.
Make sure that the maximum gas
supply pressure before the gas
pressure regulator is never more than
½ psi for both natural gas or LP gas.
The minimum supply pressure to get
the required gas input is
4" w.c. for natural gas:
10" w.c. for LP gas.
39