Miller Gold Seal 5000 소유자 매뉴얼 - 페이지 21

{카테고리_이름} Miller Gold Seal 5000에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Miller Gold Seal 5000 48 페이지.

Miller Gold Seal 5000 소유자 매뉴얼
2-6.
Installing
Gas
Supply
£~
WARNING
CYLINDERS
can
explode
if
damaged.
Keep cylinders
away from
welding
and
other
electrical circuits.
Never touch
cylinder
with
welding
electrode.
Always
secure
cylinder
to
running
gear,
wall,
or
other
stationary
support.
3
Tools Needed:
1-1/8,5/8
in
BUILDUP OF SHIELDING GAS
can
harm
health
or
kill.
Shut off
shielding
gas
supply
when
not in
use.
warn4.1
9/91
Obtain gas
cylinder
and chain
to
running
gear, wall,
or
other station
ary
support
so
cylinder
cannot
fall
and break off valve.
1
Cap
2
Cylinder
Valve
Remove cap,
stand
to
side of
valve,
and open valve
slightly.
Gas
flow blows dust and dirt from valve.
Close valve.
3
CO2 Cylinder
4
0-Ring
5
Regulator/Flowmeter
If not
supplied,
obtain proper
regu
lator/flowmeter
for
use
with
CO2
gas. Install
onto
gas
cylinder
so
that face is vertical.
Flow
rate
for
supplied regulator/
flowmeter is
set to
20 cfh
(cubic
feet per
hour).
6
Gas Rose Connection
Obtain
and install
gas hose.
ssb31*
12/92
ST-154
583
/
ST-154
823
Figure
2-5.
Installation Of Deluxe Model
Regulator/Flowmeter
6
OM-157
745
PageS