Burkert 2300 Series 빠른 시작 매뉴얼 - 페이지 12

{카테고리_이름} Burkert 2300 Series에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Burkert 2300 Series 19 페이지. Remote-positioner, installation on process valves with internal air flow
Burkert 2300 Series에 대해서도 마찬가지입니다: 사용 설명서 (12 페이지), 추가 지침 (12 페이지)

Burkert 2300 Series 빠른 시작 매뉴얼
Remove the control unit from the actuator (if present):
→ Clamp the valve body in a holding device.
→ Loosen the fastening screws (2x).
→ Remove the control unit upwards.
Fastening
screw (2x)
Fig. 2:
Disassembly the control unit
Remove the actuator from the valve body.
→ Install collet (white grommet) in pilot air port 1.
12
Control unit
Actuator
english
Typ 2300
Technical data
NOTE!
Damage to the seat seal or the seat contour!
▶ When removing the actuator, ensure that the valve is in open
position.
→ Control function A pressurize the pilot air port 1(see "Fig. 3")
with compressed air (5 bar): valve opens.
→ Using a suitable open-end wrench, place the wrench flat on the
pipe.
→ Unscrew the actuator from the valve body.
Exhaust air port
CFA, CFB
2
Pilot air port CFI
1
Pilot air port
CFA, CFB, CFI
Flats for open-end
wrench
Valve body
Fig. 3:
Installation
Other device versions
→ Do not remove actuator unless this is a customer-specific
requirement.
→ Procedure see "Devices with welded body".
Install collet:
Actuator
Nipple