Miller ArcStation 소유자 매뉴얼 - 페이지 15
{카테고리_이름} Miller ArcStation에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Miller ArcStation 20 페이지.
Miller ArcStation에 대해서도 마찬가지입니다: 소유자 매뉴얼 (44 페이지)
3-10. 60S And 60SX Weld Curtain
Tools Needed:
9/16 in.
hex bit 5/16 in.
4
HH
5
HH
1
4
EE or OO
2
3
EE or OO
6
6
1
Corner Post
.
When securing corner post to
table, bolt from back side of
table.
Remove the two rear tube caps. In-
sert corner post into each rear tube
and use the supplied two bolts FF to
secure corner posts.
2
Left Curtain Rail
3
Right Curtain Rail
.
Be sure that curtain snaps face
to the outside on curtain rails.
Slide left and right curtain rail over
each corner post. Start the supplied
four bolts KK into rings on each
curtain rail.
4
Rear Top Rail (2)
5
Rail Connector
Assemble the two rear top rails
together with the rail connector and
secure with four bolts HH, two in
from the bottom and two in from the
front.
Slide rear top rail over each corner
post and use the supplied two bolts
KK to secure top rail.
6
Rear Bottom Rail (2)
Remove grounding lug.
Use the supplied bolt EE and three
bolts OO and install rear bottom
rails to table top.
Use supplied nut ZZ to re-install
grounding lug to bolt EE.
Snap left, right, and rear weld cur-
tain to curtain rails.
Adjust side curtains to desired
angle and tighten bolts KK in rings.
NOTICE − Do not touch or place hot
parts against curtains to prevent
burning holes through curtains.
OM-247318 Page 11