Miller Spoolmatic 30A 소유자 매뉴얼 - 페이지 16

{카테고리_이름} Miller Spoolmatic 30A에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Miller Spoolmatic 30A 36 페이지. Welding guns
Miller Spoolmatic 30A에 대해서도 마찬가지입니다: 소유자 매뉴얼 (32 페이지), 소유자 매뉴얼 (32 페이지)

Miller Spoolmatic 30A 소유자 매뉴얼

5-7. Installing Gas Supply

6
5
4
Tools Needed:
1-1/8, 5/8 in.
OM-264 713 Page 12
Argon Gas
OR
7
8
CO
Obtain gas cylinder and chain to
running gear, wall, or other station-
ary support so cylinder cannot fall
and break off valve.
1
Cap
2
Cylinder Valve
Remove cap, stand to side of valve,
and open valve slightly. Gas flow
blows dust and dirt from valve.
Close valve.
3
Cylinder
4
Regulator/Flowmeter
Install so face is vertical.
1
.
Delivery pressure range must
not exceed 60 psi.
5
Gas Hose Connection
Fitting has
threads.
2
6
Flow Adjust
Typical flow rate is 20 cfh (cubic feet
per hour). Check wire manufactur-
er's recommended flow rate.
Make sure flow adjust is closed
when opening cylinder to avoid
damage to the flowmeter.
3
7
CO
8
O-Ring
Install adapter with O-ring between
regulator/flowmeter
cylinder.
1
2
3
Gas
2
5/8-18
right-hand
Adapter
2
and
CO
2
ssb3.1* 5/94 − 158 697-A