AquaScape PRO AIR 60 POND 운영 지침 및 유지보수 매뉴얼 - 페이지 4
{카테고리_이름} AquaScape PRO AIR 60 POND에 대한 운영 지침 및 유지보수 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AquaScape PRO AIR 60 POND 12 페이지. Aeration kit
STEP 1
UNPACK KIT COMPONENTS
• Carefully unpack the kit components.
STEP 2
SET COMPRESSOR
• Set the compressor in the desired location. Select a
location near a ground fault circuit interrupter (GFCI) rated
receptacle.
Note: Do not submerge
the compressor in water.
We recommend placing
it in a location above the
pond's water level, whenever
possible, to prevent
water from entering the
compressor.
STEP 3
ATTACH MANIFOLD
• Thread the 2-way manifold into the discharge of the
compressor. The 2-way manifold provides the option of
installing up to two separate airlines with the added benefit
of airflow valve controls.
4
STEP 4
ATTACH TUBING
• Attach the braided tubing with the pre-installed check
valves to each manifold outlet.
Note: The check valve is designed to prevent water
from siphoning back through the tubing and entering the
compressor. Failure to install the check valve may result
in the compressor being permanently damaged, voiding
the warranty. Confirm that the check valves are facing the
correct direction by verifying that air is able to flow freely
through the tubing toward the diffuser.
STEP 5
SECURE TUBING TO MANIFOLD
• Use the stainless steel hose clamps to secure the tubing
to the manifold outlets.
STEP 6
ATTACH DIFFUSERS
• Attach the other end of the braided tubing to the diffusers.
☎
☎
US (866) 877-6637 |
CAN (866) 766-3426 | aquascapeinc.com