HP 489183-B21 - InfiniBand DDR Switch 설치 매뉴얼 - 페이지 14

{카테고리_이름} HP 489183-B21 - InfiniBand DDR Switch에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. HP 489183-B21 - InfiniBand DDR Switch 22 페이지. Hp blc 4x ddr infiniband gen 2 switch installation guide
HP 489183-B21 - InfiniBand DDR Switch에 대해서도 마찬가지입니다: 자주 묻는 질문 (4 페이지), 매뉴얼 사용 (15 페이지)

HP 489183-B21 - InfiniBand DDR Switch 설치 매뉴얼
1.
QSFP connector
2.
HP BLc 4X DDR InfiniBand Gen 2 Switch - port 1
3.
InfiniBand cable
Figure 2-5 InfiniBand Cable Installed in Port 1 of the HP BLc 4X DDR InfiniBand Gen 2 Switch
The following list describes the callouts shown in
1.

InfiniBand cable installed in port 1 of the HP BLc 4X DDR InfiniBand Gen 2 Switch

2.
HP BLc 4X DDR InfiniBand Gen 2 Switch
You can install up to 16 InfiniBand cables in the HP BLc 4X DDR InfiniBand Gen 2 Switch. It is
not necessary to install the InfiniBand cables in any particular order. However, for the sake of
consistency, begin installing the InfiniBand cables in port 1 and continue installing the cables up
to port 16.
2.2.1 Removing an InfiniBand Cable from the HP BLc 4X DDR InfiniBand Gen 2
Switch
To remove an InfiniBand cable from the HP BLc 4X DDR InfiniBand Gen 2 Switch, pull the QSFP
connector release tab (see callout 2 in
other hand to remove the connector from the switch port.
To completely remove the cable, it might be necessary to remove a releasable cable tie on the HP
c-Class blade cable management bracket.
If it is necessary to remove a releasable cable tie from the cable management bracket to fully
release a QSFP InfiniBand connector from the switch, reverse the installation procedure
documented in the HP Cluster Platform c-Class Blade Cable Management Bracket Installation Guide
(see
Section

2.3 InfiniBand Cable Management Bracket

Once the InfiniBand cables are installed in the HP BLc 4X DDR InfiniBand Gen 2 Switch they
will require additional support and strain relief. To provide support and strain relief for the
InfiniBand cables, you must install a cable management bracket. For more information on the
cable management bracket for the HP BLc 4X DDR InfiniBand Gen 2 Switch, see the HP Cluster
Platform c–Class Blade Cable Management Bracket Installation Guide on the High Performance
Computing - Cluster Platform website:
http://docs.hp.com/en/highperfcomp.html
14
Hardware Installation
1
2
2.3).
Figure
2-5:
Figure
2-3) which releases the connector while using your