HP ProCurve 1810G-24 설치 및 시작하기 매뉴얼 - 페이지 15

{카테고리_이름} HP ProCurve 1810G-24에 대한 설치 및 시작하기 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. HP ProCurve 1810G-24 48 페이지. Procurve 1810g series
HP ProCurve 1810G-24에 대해서도 마찬가지입니다: 사양 (2 페이지), 안전 및 규제 정보 (2 페이지)

HP ProCurve 1810G-24 설치 및 시작하기 매뉴얼
2.
Check the LEDs on the switch as described below.
Power LED
When the switch is powered on, it performs its diagnostic self test. The
self test takes approximately 15 seconds to complete.
Self Test LED Behavior:
During the self test:
The Power LED will go on, followed by all LEDs turning on for 4
seconds, and finally the Port LEDs will turn on and off in a sequence
from port 1 to 24.
When the self test completes successfully:
The Power LED remains on.
The Speed LED remains on indicating the default LED mode.
The port LEDs on the front of the switch go into their normal opera-
tional mode:
If the ports are connected to active network devices, the Link
LEDs stay on and the Mode LEDs behave according to the mode
selected. In the default mode (Speed), the Mode LEDs should be
on for ports operating at 1000 Mbps and off for ports operating at
10 or 100 Mbps.
If the ports are not connected to active network devices, the Link
and Mode LEDs will stay off.
If the LED display is different than what is described above the self test
has not completed correctly. Refer to "Troubleshooting" for diagnostic
help.
Installing the Switch
Installation Procedure
Port Link/Act and
Mode LED
2-5