HP StorageWorks director 2/140 설치 지침 매뉴얼 - 페이지 13
{카테고리_이름} HP StorageWorks director 2/140에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. HP StorageWorks director 2/140 22 페이지. Universal port module kit
HP StorageWorks director 2/140에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (24 페이지)
Required Items
Check that the following items are available before beginning the installation.
•
#2 Phillips screwdriver
•
Lift device (recommended)
Rack Mounting Guidelines
This section describes guidelines for installing more than one Director and positioning
the Director 2/140 on the lift device.
Tips for Installing More than One Switch
Review the following tips:
•
Install the first Director in the lowest position of the rack, allocated for switches.
•
Consider leaving a space of 1U open at the top and bottom of the rack, to allow
easier cabling access.
•
If installing more than one Director 2/140 in a single rack, consider leaving a
space of 1U open above and below each Director to allow easier cabling access.
•
If installing more than one switch, HP recommends installing an optional Power
Distribution Unit (PDU) in the bottom of the rack. HP ships two PDU power cords
with the Director 2/140.
•
Make sure to connect power cables as you install each individual switch.
director 2/140 rack mount kit installation instructions
Installation Instructions
3