Dickinson NEWPORT 설치 및 운영 매뉴얼 - 페이지 4

{카테고리_이름} Dickinson NEWPORT에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dickinson NEWPORT 10 페이지. Diesel heater
Dickinson NEWPORT에 대해서도 마찬가지입니다: 작동 및 설치 지침 매뉴얼 (16 페이지), 사용 설명서 (19 페이지)

3

INSTALLATION

LOCATION
The Newport solid fuel should be mounted on a bulkhead. The area available must be large enough to
allow at least 8" of side clearance from combustible surfaces. It must be lined with high-density heat
retardant insulation and finished with a light gauge metal preferably stainless steel. Locate the heater
as close to the floor as possible for maximum stack length and to provide good heat convection. The
location must also take into consideration stack configuration and insure that the chimney above deck
is clear of any obstruction.

MOUNTING AND SECURING

Screw or bolt the heater to the stainless steel panel on the bulkhead using the rear mounting brackets
provided.
FLUE STACK
The length and straightness of the flue stack are important to the efficient burning of the heater.
Diameter
-
3" (7.82cm)
Recommended length -
3 to 4 ft (.91 to 1.21m)
Note
The stack must be the correct diameter.
The flue pipe requires 1" (25mm) of clearance as it rises through the deck.
Elbows in excess of 45 degrees not recommended.
A barometric damper is highly recommended to slow the burning but keep the
draft strong. A manual flue damper is also available but is only recommended when installed in a very
short chimney length otherwise a barometric damper is the best.
THE ROUND PIPE IS SQUEEZED TO FIT THE OVAL FLUE COLLAR ON THE HEATER