Cinier Greenor 설치 지침 - 페이지 7

{카테고리_이름} Cinier Greenor에 대한 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Cinier Greenor 9 페이지. Fan coil

Cinier Greenor 설치 지침
Picture No 5 - Electrical connection of the rough

5 - Putting into service

Pressurize the hydronic circuit.
Check that all connections are tight and leak free.
Purge the air out by opening the manual air bleeder valve; insufficient purging may result in an inadequate
heating performance.
Shut down the electrical circuit.
Check for potential electrical leakages
Turn on the switch at the bottom left corner of the unit
Using the remote control, operate the fan coil unit to check that all the fans function properly at the 3 operating
speeds. Check also that the opening of the thermal bypass valve opens correctly.
Once all these parameters have been configured and checked, turn off the unit.

6 - INSTALLING THE FRONT PANEL

Install the front panel holding it by the metallic frame and
raising it slightly above the wall casing to hook the upper
notch to the back of the wall casing.
Center the notch by looking at it from one side.
The front panel can then be fastened to the two bottom
clamps.