Cisco 2960-C 시작하기 매뉴얼 - 페이지 12
{카테고리_이름} Cisco 2960-C에 대한 시작하기 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco 2960-C 25 페이지.
Cisco 2960-C에 대해서도 마찬가지입니다: 설치 매뉴얼 (37 페이지)
Installing the Switch
Equipment That You Need
Before You Begin
Catalyst 3560-C and 2960-C Switch Getting Started Guide
12
See the
"Accessing Help Online" section on page 22
documentation.
This section covers desk-mounting procedures. As examples, all the illustrations
show the Catalyst 2960CPD-8PT-L switch. For alternate mounting procedures,
such as installing the switch in a rack, under the desk, on a wall, or for using a
mounting tray and magnet, see the Catalyst 3560-C and 2960-C Switch Hardware
Installation Guide on Cisco.com.
Number-2 Phillips screwdriver
•
Drill with a #27 drill bit (0.144-inch [3.7 mm])
•
Before installing the switch, these guidelines must be met:
Clearance to front panels is such that the LEDs can be easily read.
•
Power cord reaches from the power outlet to the connector on the switch.
•
•
Cabling is away from sources of electrical noise, such as radios, power lines,
and fluorescent lighting fixtures.
Temperature around the unit does not exceed 113°F (45°C). If the switch is
•
installed in a closed or multirack assembly, the temperature around it might
be greater than normal room temperature.
Humidity around the switch does not exceed 95 percent.
•
Altitude at the installation site is not greater than 10,000 feet.
•
Catalyst 3560-C and 2960-C Switch Getting Started Guide
for a list of supporting
OL-23802-02