Epson BrightLink Pro 1430Wi 설치 매뉴얼 - 페이지 5
{카테고리_이름} Epson BrightLink Pro 1430Wi에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Epson BrightLink Pro 1430Wi 26 페이지. Control pad and touch unit
Epson BrightLink Pro 1430Wi에 대해서도 마찬가지입니다: 시작하기 (6 페이지)
1 Package Contents
Touch Unit
The following parts are packaged with your projector and are necessary when attaching the Touch Unit. When
installing the Touch Unit on a non-magnetic surface, you will also need three M4 screws.
(markers are inside the unit)
Touch Unit connection cable
Control Pad
The following parts are packaged with your projector and are necessary when attaching the Control Pad.
When installing the Control Pad on a wall, you will also need four M4 × 20 mm screws.
Control Pad
Touch Unit and markers
Label (×4)
AA size batteries (× 2)
Spacer for screw hole (×3)
Tape (approx. 2.4 in [6
cm]) for securing the
markers (×12)
Rubber feet
Infrared deflector (approx.
11.2 in [28.5 cm]) (×8)
Port protection
stickers