Epson BrightLink Pro 1430Wi Instrukcja instalacji - Strona 5

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Projektor Epson BrightLink Pro 1430Wi. Epson BrightLink Pro 1430Wi 26 stron. Control pad and touch unit
Również dla Epson BrightLink Pro 1430Wi: Rozpocznij (6 strony)

1 Package Contents

Touch Unit
The following parts are packaged with your projector and are necessary when attaching the Touch Unit. When
installing the Touch Unit on a non-magnetic surface, you will also need three M4 screws.
(markers are inside the unit)
Touch Unit connection cable

Control Pad

The following parts are packaged with your projector and are necessary when attaching the Control Pad.
When installing the Control Pad on a wall, you will also need four M4 × 20 mm screws.
Control Pad
Touch Unit and markers
Label (×4)
AA size batteries (× 2)
Spacer for screw hole (×3)
Tape (approx. 2.4 in [6
cm]) for securing the
markers (×12)
Rubber feet
Infrared deflector (approx.
11.2 in [28.5 cm]) (×8)
Port protection
stickers