Cisco 12816 교체 지침 매뉴얼 - 페이지 8
{카테고리_이름} Cisco 12816에 대한 교체 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco 12816 32 페이지. Blower module and air filter for cisco 12016, cisco 12416, and cisco 12816 router
Cisco 12816에 대해서도 마찬가지입니다: 포장 풀기 사용 설명서 (28 페이지), 데이터시트 (9 페이지), 사용 설명서 (16 페이지), 교체 지침 매뉴얼 (18 페이지)
Removing and Installing the Chassis
Procedures for removing and installing the chassis are described in the following sections:
•
•
•
•
•
•
•
Unpacking the Replacement Chassis
The process of unpacking the replacement chassis consists of opening and disassembling the shipping
package to expose the chassis on the shipping pallet, then removing the chassis and scissor-jack platform
from the shipping pallet. See the
procedures.
Preparing the Chassis
When the replacement chassis and scissor-jack platform have been placed near the rack site, temporarily
connect the central office grounding system or interior equipment grounding system to the supplemental
bonding and grounding receptacles on the router. There are two receptacles on the front flanges of the
chassis, near the lower corners of the switch fabric card cage. (See
receptacles on the top of the power interface panel on the back of the chassis. (See
bonding and grounding receptacle consists of a round bolt hole and an elongated bolt hole, surrounded
by an area of bare metal.
For more information on the bonding and grounding cable and connector requirements, refer to the
"Supplemental Unit Bonding and Grounding Guidelines" section in the Cisco 12016, Cisco 12416, and
Cisco 12816 Router Installation and Configuration Guide.
Cisco 12016, Cisco 12416, and Cisco 12816 Router Chassis Replacement Instructions
8
Preparing the Chassis, page 8
Installing the Replacement Chassis, page 15
Checking Router Operation, page 22
"Unpacking the Replacement Chassis" section on page 8
for detailed
Figure
3.) There are also two
Figure
4.) Each
78-16082-01