Cisco 2524 - Router - EN 설치 준비 - 페이지 6
{카테고리_이름} Cisco 2524 - Router - EN에 대한 설치 준비을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco 2524 - Router - EN 19 페이지. Troubleshooting guide
Cisco 2524 - Router - EN에 대해서도 마찬가지입니다: 구성 매뉴얼 (23 페이지), 구성 매뉴얼 (23 페이지), 개요 (10 페이지), 문제 해결 매뉴얼 (4 페이지)
Installation Checklist
The router's AC power supply includes the following features:
•
Autoselects either 110V or 220V operation.
•
All units include a 6-foot (1.8-meter) electrical power cord. (A label near the power cord
indicates the correct voltage, frequency, current draw, and power dissipation for the
unit.)
Warning
protection. Ensure that a fuse or circuit breaker no larger than 120 VAC, 15A U.S.
(240 VAC, 10A international) is used on the phase conductors (all current-carrying
conductors). (To see translated versions of this warning, refer to the appendix "Translated
Safety Warnings.")
The Cisco 2524 offers a direct current (DC) power supply. See the section "DC Power
Specifications" in the chapter "Installing the Cisco 2524 and Cisco 2525 Routers" for more
information.
Installation Checklist
The Installation Checklist lists the procedures for initial hardware installation of a new
router. Make a copy of this checklist and mark the entries as you complete each procedure.
Include a copy of the checklist for each system in your Site Log. (See the next section,
"Creating a Site Log.")
2-6 Cisco 2524 and Cisco 2525 Router User Guide
This product relies on the building's installation for short-circuit (overcurrent)