Cisco N540X-6Z18G-SYS-A 설치 준비
{카테고리_이름} Cisco N540X-6Z18G-SYS-A에 대한 설치 준비을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco N540X-6Z18G-SYS-A 14 페이지.
Cisco N540X-6Z18G-SYS-A에 대해서도 마찬가지입니다: 매뉴얼 (30 페이지)
Prepare for Installation
Before you install the Cisco NCS 540, you must prepare your site for the installation.
Preparing your site involves these tasks:
•
•
•
•
•
•
•
•
•
•
•
•
General Precautions
Observe the following general precautions when using and working with your chassis:
• Keep your system components away from radiators and heat sources, and do not block cooling vents.
• Do not spill food or liquids on your system components, and never operate the product in a wet
• Do not push any objects into the openings of your system components. Doing so can cause fire or electric
• Position system cables and power supply cable carefully. Route system cables and the power supply
• Do not modify power cables or plugs. Consult a licensed electrician or your power company for site
• If you turn off your system to avoid damage to the system components, wait at least 30 seconds before
General Precautions, on page 1
Site Planning Checklist, on page 2
Environmental Requirements, on page 2
Airflow Guidelines, on page 2
Site Power Guidelines, on page 6
Site Cabling Guidelines, on page 7
Tools and Equipment, on page 8
Prepare Your Location , on page 9
Prepare Yourself , on page 9
Prepare Rack for Router Installation, on page 10
Cabinet Selection Guidelines, on page 10
Unpack the Cisco NCS 540 Small Density Router, on page 11
environment.
shock by shorting out interior components.
cable and plug so that they are not stepped on or tripped over. Ensure that nothing is rests on your system
component cables or power cable.
modifications. Always follow your local and national wiring rules.
turning it on again.
Prepare for Installation
1